JupiterHeating.com

UPS is not picking up on Wednesday, December 24 and Thursday, December 25. Orders will ship out on Friday, December 26.

Directory: Catalog > Boilers > Munchkin Boilers > Munchkin Parts

Parts for the Munchkin 80M Boiler, Revision 2

We stock the most common Munchkin Boiler repair parts. We also will obtain special-order Munchkin parts from the manufacturer or from one of our other sources.

  • Parts are listed in numerical order below. You can also view this list in a chart view with parts diagram.
  • This series of the 80M Munchkin Boiler Revision 2 has a manufacture date after 12/20/06. If this is not your unit, please go to our main Munchkin Parts Page to find your unit.


Parts for the 80M R2 Boiler:

  • 7000P-805: Plastic Tubing 3/16 in. ID (Blocked Vent Pressure Switch)

  • 7250P-005: Gasket (Flame Rectification Probe/Spark Electrode)

  • 7250P-019: ECO High Limit Sensor

  • 7250P-069: Screw M4 X 8MM (Flame Rectification Probe/Spark Electrode)

  • 7250P-080: Relief Valve

  • 7250P-085: Combustion Blower (Blower Motor)

  • 7250P-089: Thermodisc Flue 210 Degrees

  • 7250P-091: LED Display Box with Ribbon Cable (Only if the main control board is 926.)

  • 7250P-096: Water Pressure Switch

  • 7250P-150: Blocked Vent Pressure Switch (new # 64980007)

  • 7250P-151: Steel Push Retainer (Thermodisc Flue ECO)

  • 7250P-152: O-Ring 007 (Blocked Vent Pressure Switch)

  • 7250P-153: S.S. Hex Nut 10-32 (Blocked Vent Pressure Switch)

  • 7250P-160: Ceramic Target Wall

  • 7250P-206: Screw Torx M5 X 22M (Air/Gas Channel to Burner Door)

  • 7250P-210: Hose Clamp (Condensate Assembly)

  • 7250P-221: Brass Nipple 1 X 1-1/4 X 3-3/4 in.

  • 7250P-226: Blower Motor Gasket

  • 7250P-311: PVC Black Tubing 1/8 ID (thermodisc Flue ECO)

  • 7250P-332: Display for 925 Control Board (includes Ribbon Cable) - DISCONTINUED

  • 7250P-352: Control Board Hold Down Clips

  • 7250P-378: Fuse (Control Board)

  • 7250P-450: Dungs Gas Valve

  • 7250P-478: Screw M5 x 14MM (Combustion Blower)

  • 7250P-644: Gas Valve Adapter Plate, with Screws (new # 64980046)

  • 7250P-646: PVC Tee Sch. 40 3/4 in. (Condensate Assembly)

  • 7250P-647: Poly Plug 3/4 in. NPT (Condensate Assembly)

  • 7250P-648: PVC Nipple Sch. 80 3.4 in. NPT (Condensate Assembly)

  • 7250P-649: Cable Clamp (Condensate Assembly)

  • 7250P-653: Spark Cable

  • 7250P-667: Thermistor

  • 7250P-671: Cabinet Latch and Gasket Kit (with Screws)

  • 7250P-673: Leveling Foot

  • 7250P-684: Burner Door

  • 7250P-685: Air/Gas Channel

  • 7250P-696: 5 Pin Wiring Harness

  • 7250P-697: 9 Pin Wiring Harness

  • 7250P-700: Low Voltage Wiring Harness (10 Pin/20 Pin Main Wiring Harness, with Gas Valve Plug)

  • 7250P-702: Burner Door Ceramic Refractory

  • 7250P-704: Screw M4 X 8MM (Ceramic Target Wall)

  • 7250P-705: Gas Piping Assembly (with Shut-Off Valve, Screws)

  • 7250P-717: Screw M4 x 20MM - Gas Valve Adapter

  • 7250P-724: Condensate Hose Assembly

  • 7250P-731: 926 Control Board Upgrade Kit

  • 7250P-744: 3 in. Vent Adapter

  • 7350P-008: 926 Control Board - For units built after July, 2008, or if the board has been previously upgraded from 925 to 926

  • 7350P-009: Display Board for 926 Control (new # 64980136)

  • 7350P-020: Spark Electrode (with Gasket)

  • 7350P-624: 24VAC Gas Valve Coil Only - Grey (discontinued, please order the complete gas valve assembly)

  • 7500P-016: NIT Burner

  • 7500P-039: Flame Rectification Probe (with Gasket)

  • 7500P-067: Nut M6 (Burner Door)

  • 7500P-074: Gasket (Air/Gas Channel to Burner)

  • 7500P-075: Gasket (Air/Gas Channel to Combustion Blower)

  • 7500P-092 White Swirl Plate (new # 64980049)

  • 7500P-105: Screw M5 x 12MM (Gas Valve Adapter Plate)

  • 7500P-109: Washer M4 (Ceramic Target Wall)

  • See Accessories - PC connection, vent kits, mesh screens, etc.


Download Literature: Loading times will vary depending on the speed of your Internet connection. After the download is complete, use your browser's back arrow to return to this page.

 

UPS is not picking up on Wednesday, December 24 and Thursday, December 25. Orders will ship out on Friday, December 26.